Session 05 — 2026-03-16e — TWRP v1.0 Build Complete

Session 05 — 2026-03-16e

Duration: ~15 min · Phase: 03b (TWRP)

Added rsync to the Docker image. Relaunched build. Completed 1367/1367 steps in 1m06s.

Output: builds/twrp/twrp-noteair1-v1.0.img (52 MB). First complete TWRP build for Note Air 1 — untested on hardware.

More posts