R05–R08 — High Severity Risks

R05 — Partition Size Mismatch

FieldValue
Severity🟠 High
TriggerNA2 image larger than NA1 partition slot

Always check image size vs partition size from Phase 01 partition table before flashing any NA2-derived image onto NA1.


R06 — Incorrect fstab Block Paths

FieldValue
Severity🟠 High
TriggerBooting NA2 system with UFS paths on NA1 eMMC

Phase 05 core task. Never flash an un-patched system/vendor from NA2. The fstab must be rewritten for eMMC block devices before use on NA1.


R07 — Incremental OTA on Rooted Device

FieldValue
Severity🟠 High
TriggerOTA update applied on Magisk-rooted device

Incremental OTA will not install cleanly on a rooted device (partition hash mismatch). Use only full firmware images. Block OTA in AFWall+ during development.


R08 — Accidental Userdata Wipe in TWRP

FieldValue
Severity🟠 High
TriggerWrong option selected in TWRP menu on e-ink display

TWRP recovery menu interaction is slow on e-ink. Proceed slowly and confirm each action. The wipe data operation is irreversible without a backup.

More posts